DCOF – Data Center of the Future
yesterday we had a virtual event provided by some of the leaders in Data Center Computing (Cisco, VMware, EMC, Oracle, NetApp, APC, EMERSON) the web virtual Event entail some of the challenges and current design's as well as future design and solutions we may encounter in Data Centers.
From my prospective the main event where the 2 first presenters Cisco and VMware, both have joind forces to show you how the Data Center of the Future should look like, VMware as the Application infrastructure and Cisco as the Networking complimentary.
We will expect to see them more and more in Data Centers providing High Availability Fault tolerance and network resilience between Data Centers.
Some of the hot discussed topics where the:
- VN-link – amazing Cisco Nexus 1000V basically that is a replacement for vSwitch (VMware layer 2 switch on ESX/ESXi) and I will add to it an amazing with huge amount of capabilities in compare to the vSwitch under the ESX/ESXi.
- FCOE – Fiber Channel Over Ethernet std although not new, in the context of Data Center resiliency, management, scalability and cost reduction FCOE can is defiantly an option.
- vSphere – VMware Cloud solution version 4, was announced several weeks ago officially by VMware, yesterday was interesting to see the vision for the data center and there honesty about some of their weakness in the networking area (where Cisco compliment them to some level).
I work today a lot with VMware solutions and see their adaptation as their products advanced, the DCOF will be very interesting…
Monday, July 13, 2009
CCIE Re-certification
Advice unless you have a spare time or your job help you (time, money, and they need it) do not consider a different track, specialize in your own track be the best you can be where you at.So Wish me Luck (I will keep my date to my self for now) :-)
Sunday, March 01, 2009
TCP Window Scale
Sunday, December 21, 2008
MPLS Deployment reasons
1) Faster convergence, in the old days that was a valid reason due to the relatively complex forwarding task that required more resources then Label forwarding. Today non relevant
2) RFC 1483 the newer 2684 AAL5 ATM Adaptation Layer 5 the implementation of IP over ATM
3) BGP Core Free on the SP network, as with MPLS lookup is done based on Labels and not destination address there is no need to have the BGP table in the Core for external prefixes lookup's. this is a massive change from the requirement that Every router in the core must have BGP enabled (cpu and memory intensive load) to only the edge router have BGP enabled mean higher performance and capability.
Note: edge routers still need to have the BGP routing tables, edge routers are translating between ip routing decision to label based decisions.
4) Deployment scalability, when we face with large scale client to deploy (client that connect with 50 - 300 sites and more) we need to have under the consideration the deployment scalability and management, with that in mind 2 models of deployment are optional:
a) VPN Overlay - creating a point to point connection over the SP network, can be achieved in layer 1, 2 or 3.
Layer 1 TDM E1 T1... Layer 2 ATM FR... Layer 3 GRE, IPIP...
b) Peer to Peer - creating a connection between sites trough the ISP and with him, what I mean is that the SP need to join the client network and to achieve client privacy the SP need to manage acl's and routing updates, not very scalable and a lot of overhead. notice that in addition to the disadvantage for the SP on the additional management overhead and complexity there is the client control (doesn't have any) of his layer 3 network trough the SP.
With MPLS the VPN allow the Peer to Peer bad model to have advantage over the Overlay model where in the MPLS we use VRF Virtual Routing Forwarding separators between each network and the configuration is done only on each new site. meaning that if I am an SP and I have 3 client (Cisco, Microsoft, Verizon) each vrf will have a unique color vrf Cisco, vrf Microsoft and vrf Verizon, and to join a new branch is only to color this branch traffic accordingly, so the main work is done in the initial design and implementation and any new addition is actually very simple to add.
5) TE - traffic engineering is a small phrase for a very big spectrum of options, normally traffic routing is decided at each point separately and usually the best route is chosen according to the shortest path to destination, using TE we can make the routing decision based on multiple criteria options. allowing the traffic to fully utilize network capability.
FRR - Fast ReRouting is a very good feature that allow you to detect and reroute based on router availability in less than 50ms Very important in high sensitive traffic like VoIP.
Friday, October 24, 2008
JUNIPER JNCIA-ER SCORE 90
Friday, October 10, 2008
Spanning Tree Basics
Friday, May 02, 2008
10 CCIE LAB TIPS
- Read the entire exam – now I know everyone is saying that and even Cisco it advising that in there site, but this is one of the important things you need to do before you start configuring as when you start configuring, your mind is set to different mode and you will miss important details.
- Take Notes - In addition to step 1 you must know to take notes, what I mean you ask yourself?! Well when you read the exam you will probably be thinking "am I wasting my time reading when other are typing and almost finishing their exam" I say NO you are not but because you all stress and your brain is speeding in almost 200mph you will not remember if you will not take notes.
- Work Your Way UP – After first two steps are done you are probably 30 min – 40 min into your exam do not panic, work in a step by step layer 2 to layer 3…
- Ask The Proctor – there was in my lab a real nice person that I am sorry I didn't ask for his name but for me his name was Mr. Proctor and whenever I had a question about something that I didn't understand or I thought that it is not well asked then I got up from my seat and went to his desk and ASKED, no shame, If you do not understand ASK that is one of his jobs, Accept for escorting you to the dining room J
- Don't ASK Dumb Questions – The Proctor will not give you an answer to your lab question, he will only answer "yes" or "no" format and only if he understand from your question that you know what you are talking about, so do not go and ask "question 1.1 what do you want me to do here" (In CCIE Routing and Switching Practice Labs, Cisco Press book you can see a lot of questions / Answers like that).
- Be Polite – the proctor doesn't work for you so be nice, that is the end of proctor candidate relation advice.
- You Can Jump Back and FWD – the exam is open to your judgment you can say I will do first security then multicast or I will do IPv6 last
- Keep Track – the exam have a lot of questions and sections, you need to write down questions and/or sections you finished, I myself written every question and its points, when done I have marked with "ok" when skipped marked with "later" when I have finished I looked on my paper and made sure I didn't left any question without "ok"
- Know How to check – after every question I did a check to make sure that what they want to work dose work, it is not always sufficient to put the commands as some time one section is relaying on another and putting the command relating to that question will not work until you add or remove other commands, I hope that is not to confusing, but most of the exam time went in my exam to verification. Also once you go to sections like security that may brake other sections, I would go back and verify the sections all over again and if they don't work I know where is the problem, if I didn't check every step it would be hard and more stressful when something would not work at the end.
- Do not panic – that is important and for some it is more for other it is less, when you see the exam for the first time do not panic take it and brake it to small pieces, and do it one step at a time, if you face a problem skip ahead do not try to solve it for 2hr you can come back to it later
GOOD LUCK
Monday, April 28, 2008
CCIE LAB Learn Process
Sunday, April 20, 2008
CCIE #20572
Saturday, February 16, 2008
IPSec Basics
Tuesday, February 12, 2008
New Job
Saturday, February 02, 2008
Juniper start here
Wednesday, January 30, 2008
CCIE R&S CBAC FireWall
This is In response to the comment posted: The ACL has no direct relation to the CBAC firewall, it is there to prevent traffic coming into your network from the outside, the inspection rule is there to inspect traffic going out from your network. if the ACL was not there the traffic would have been inspected but still people would able to go into your network. so if you want to block traffic you must have ACL but if you inspect traffic then even if there is a deny statement on the outside interface traffic is allowed to return. so the short answer CBAC is not inspecting the ACL, CBAC is inspecting what you tell him on the inspection rule.
Monday, January 21, 2008
CCIE Lab San Jose 16 Jan 2008
Thursday, January 03, 2008
Sunday, December 30, 2007
CCIE BGP ORF
Wednesday, December 26, 2007
Mary Christmas and Happy New Year
Wednesday, December 05, 2007
CCIE EIGRP METRIC
One of the annoying fileds in my opinion is calculation, I hate them! in my mind it is just in the way of the cool stuff. but unfurtunetly to get to the cool stuf you need to calculate.so I would like to start by giving you a little review and may be more indepth look over EIGRP Metric, as we all should know EIGRP is a Hybrid Routing Protocol that use a Composite Metric in his DUAL Diffusing Update Algorithm. the Composite metric is composed (good word selection :-)!?) from K Values.
K1 K2 K3 K4 K5
K1 = Bandwidth = 1 meaning it is used in the calculation by default.
K2 = load = 0 you gust it, meaning that is not participating in the calculation by default.
K3 = Delay = 1 you can take it from here
K4 = Reliability = 0
K5 = MTU = 0
the K values tells us if the value is participating in the calculation or not and what is the weight of the value, meaning that if you set K1 to 3 then it means that the weight of K1 will be 3 times more "important" or in other words it will take the BW * 3.
So now we know what are the "K" Values we need to know how to calculate:
well I will not endolge you with long version of the formula as it is hardly ever use (by hardly I mean I never seen it fully used).
Metric = [256 * (10^7/BW) + 256 * (Accumulated Delay)]
in the attached picture I draw a small network to demonstrate what I mean to get from R1 to R3 netwrok 3.3.3.0/24
you have the following options:
R1 -> R2 -> R3
The lowes bandwith in that path is 64Kbps
The Delay is 20000 for the 64Kbps link 100 for the 100 Mbps linke and another 100 for the 3.3.3.0/24 network link also 100Mbps = 20200 microseconds delay.
so now lets put all into the formula:
Metric = [256 * (10^7/BW) + 256 * (Accumulated Delay)]
Metric = [256 * (10^7/64) + 256 * (20000 + 100 + 100)]
Metric = [256 * (156250) + 256 * (20200)]
Metric = [40000000 + 5171200]
Metric = 45171200 = FD Feasable Distance (I will Talk about this in a bit)
R1 -> R4 -> R3
Metric = [256 * (10^7/BW) + 256 * (Accumulated Delay)]
Metric = [256 * (10^7/64) + 256 * (20000 + 1000 + 100)]
! note that now you have 1000 in the path as it is a regular 10 Mbps Ethernet
Metric = [256 * (156250) + 256 * (21100)]
Metric = [40000000 + 5401600]
Metric = 45401600 = FD
R1 -> R2 -> R4 -> R3
Metric = [256 * (10^7/BW) + 256 * (Accumulated Delay)]
Metric = [256 * (10^7/64) + 256 * (20000 + 20000 + 20000 + 100)]
Metric = [256 * (156250) + 256 * (60100)]
Metric = [40000000 + 15385600]
Metric = 55385600 = FD
R1 -> R4 -> R2 -> R3 I think you should do it now, you should get the point of the calculation
Now that have an idea how to calculate we need to see what route is preferd, in that senarion it is easy but in complex networks this basics can help us understand the proccess (leave the calc to the router).
FD as I was mentioning this Feasable Distance is the Metric that our router see from his outgoing interface to the point he wish to go, also caled end-to-end metric.
AD Advertised Distance that is the Distance we recive from our directly connected neighbor for the path we wish to go.
so for FD of R1 ->R2 ->R3 we get an AD of R2->R3.
FS Feasible Successor is the Router that is chosen by us to be the next hop to the Destination Prefix.
FC Feasible Condition is a rule that tells us in a very logical way to select a FS he must send to us an AD that is lower then the FD.
if we received from R4 for example a AD higher then the FD that we had already in our topology table to get to R3 then we would not consider him to be a Feasible Successor.
so final step lets take the Paths and FD and Calculate the AD and see what path sould we go as I am already exited where to go from now:
Now our AD for the Paths sent to R1:
R2 -> R3
Metric = [256 * (10^7/BW) + 256 * (Accumulated Delay)]
Metric = [256 * (10^7/100000) + 256 * (100 + 100)]
Metric = [256 * (100) + 256 * (200)]
Metric = [25600 + 51200]
Metric = 76800 = AD
Metric = 45171200 =FD
R4 -> R3
Metric = [256 * (10^7/BW) + 256 * (Accumulated Delay)]
Metric = [256 * (10^7/64) + 256 * (20000 + 100)]
Metric = [256 * (156250) + 256 * (20100)]
Metric = [40000000 + 5145600]
Metric = 45145600 = AD
Metric = 45401600 = FD
R1 -> R2 -> R4 -> R3
Metric = [256 * (10^7/BW) + 256 * (Accumulated Delay)]
Metric = [256 * (10^7/64) + 256 * (20000 + 20000 + 20000 + 100)]
Metric = [256 * (156250) + 256 * (60100)]
Metric = [40000000 + 15385600]
Metric = 55385600 Here we can clearly see that there is not way that this route can meet the FC.
So we have a winner:
Metric = 76800 = AD
Metric = 45171200 =FD
to get to R3 3.3.3.0/24 R1 will take the path R1 ->R2 -> R3.
if it will fail then the path R1 ->R4->R3 will be taken as he still qualified to meet then FC for FS
FS Feasible Successor the second path in the topology that is set only of FC are met.
I hope this was an intersting article :-)